Puerto Maldonado Iberia

Status
In operation

Length
160 km

Voltage
138 kV

Capacity
25 MVA

COD (planned)
Feb 2025

The Puerto Maldonado – Iberia project encompasses the construction of a 138 kV transmission line of approximately 160 km, the new Iberia Substation (138/22.9 kV and 25 MVA), and the expansion of the Puerto Maldonado Substation.
This infrastructure strengthens the capacity and reliability of the electrical grid in the Madre de Dios region, guaranteeing energy supply for the population of Iberia and the Iberia-Iñapari Rural Electrical System. Additionally, it ensures coverage for growing demand, driving industrial development and attracting new investments to the area.The Puerto Maldonado - Iberia project is divided into three infrastructure components:

  • Component 1: Puerto Maldonado - Iberia Transmission Line of approximately 160 km.
  • Component 2: Iberia 138/22.9 kV 25 MVA substation.
  • Component 3: Expansion of the Puerto Maldonado Substation.

Puerto Maldonado - Iberia is a project of the electricity sub-sector that will make it possible to supply electricity to the area and meet the growing demand for electricity, especially for the development of investment projects, in addition to meeting the growing demand for electricity from the Iberia - Iñapari Rural Electricity System and supplying electricity to the city of Iberia, both for the population and industrial loads in the area.