Status
Under construction
Length
36 km
Voltage
2x220 kV
Capacity
-
COD (planned)
2025
The project starts at Don Goyo, with a line that reaches the existing La Ruca substation via a 36 km 220 kV double-circuit line. These infrastructures will serve to reinforce the power transmission structure in the town of Ovalle and surrounding areas.