localizacion proyecto Don Goyo

Status
In operation

Length
36 km

Voltage
220 kV

Capacity
-

COD
2026

The project starts at Don Goyo, with a line that reaches the existing La Ruca substation via a 36 km 220 kV double-circuit line. These infrastructures will serve to reinforce the power transmission structure in the town of Ovalle and surrounding areas.